Failure to comply with the following steps will result in a void of the manufacturer’s warranty. The dealer/ installer will be responsible for all costs associated with failure to comply, including replacement parts, and/ or additional on-site visits needed for repair work.
Zero G: Overview - Please Review before installation.
Opening the Box
- Do not remove the foam(A) or packaging inside the cassette at this time.
- Cut the straps to open the box, then remove the trim pieces, doors assemblies, and mounting brackets and set all of them out of the way of the installation area.
- Tear away the foam from the top of the case but leave the foam inside the case
Pre-mounting and Power Consideration
Before mounting the screen, consider how power and data will be routed to the screen. Depending on site conditions, it may be necessary to run these wired or pull a cord before case installation. With the breaker Off, run the power and control cables through their appropriate case penetrations.
- Pass the control and power cables through the appropriate openings in the case.
Installation Type - Suspended Ceiling
Step 1:
- Measure full length of the case (F).
- Blocking required. The ceiling or wall used for fixture installation must be able to support 300 lbs or more. Failure to properly secure the screen may result in injury and/or damage.
Step 2:
- Cut a hole in the ceiling using the Z and W values from the formula above.
Step 3:
- Secure 4 threaded rods to structural supports above the installation location as shown.
- Failure to properly level the mounting brackets will create issues with the screen over time, damaging the screen material.
Step 4:
- Hook the suspended ceiling brackets into the case as shown. Position along the length of the case such that the large holes will line up with the threaded rods, and lock down.
Step 5:
- Lift the case up to the threaded rods and secure it in place with the installer provided nuts and washers.
- Installation requires three or more people. The product weighs up to 225 lbs. Please use safe lifting and rigging techniques.
Step 6:
- Install the door trim test piece into the case to use as a reference for the following Step 7.
Step 7:
- Raise the case up until the door test trim piece is flush with the ceiling.
- Repeat this at the front and back of all mounting brackets.
- Level the case to within 1/8” over 10’ using the case length (F); as well as 1/2”over 1’ using the depth (W) of the pocket.
For issues, contact Screen Innovations:
Phone: 512.832.6939 Option 3
Website: www.screeninnovations.com