Step 1: FLOWN KIT
- Flown Kit Ceiling Mount should be installed between 6” and 1/3 the width of the screen from the left and right edge.
- Once placement is determined, anchor the ceiling mount to a joist, beam, or similar support structure.
- Make sure to drill the holes into a beam that can support the weight of the screen.
Step 2: FLOWN KIT
- Feed the cable through the griplock leaving sufficient slack to attach the griplock assembly to the channel nuts in the upper frame.
- Height adjustment and leveling is done by pulling the cable through the griplock, to lower the flown height, lift the screen up to release tenson and depressing the griplock release.
For issues, contact Screen Innovations:
Phone: 512.832.6939 Option 3
Website: www.screeninnovations.com
Comments
0 comments
Please sign in to leave a comment.