Solo 3 Flown Kit - 575/675
Screen Innovations
Initial Considerations
Before starting, plan your installation:
- Measure the cassette length and mark the centerline of your viewing area.
- Brackets must be installed 2"–8" from each end of the cassette.
The standard kit includes two Solo 3 – 575/675 Flown Kit Brackets, each rated to hold 50 lbs.
If your screen weighs over 100 lbs, you'll need a third bracket.
Warning: Ceiling fasteners are not included, as ceiling materials vary. Use fasteners appropriate for your ceiling type and load requirements.
Installation Instructions
-
Establish Viewing Area
Identify the vertical centerline of the desired viewing area. This will serve as your primary reference point for bracket placement. -
Determine Bracket Placement
Measure the full length of the cassette. Brackets must be mounted 2" to 8" from each end of the cassette.- Calculate the minimum and maximum horizontal spacing based on cassette length.
- Mark bracket locations on the ceiling using these measurements, ensuring they are aligned with structural support (e.g., joists or blocking).
Comments
0 comments
Please sign in to leave a comment.