Nano Indoor Shades
Complete guide to our precision-engineered Nano shading solutions
Nano Box
Nano Open Roll
Nano Pocket
Nano Duo
Nano Coupled
Nano Manual
Janus
1K PoE Switch
SI IP Bridge
Kratos
TaHoma Switch
Side Channels
TRO.Y 2
Suite XVI
C4 Zigbee
Pocket Flap and Hanger Extrusions
SI Eco-System - 485
SI Eco-System - PoE
SI Eco-System - Zigbee
SI Eco-System - RTS
RF Remote - Standalone
Zigbee Remote Standalone
TaHoma Switch
Bond Bridge Pro - RTS Only
Bond Bridge Pro - EcoSystem Integration
3rd Party Integration
Wiring Pinouts
How to service the V2 Nano Box
How to swap a motor in a V2 Nano Box
How to swap a motor in a V1 Nano Box
How to fix roll overs and hembar jams
Nano Open Roll V2 motor Swap
How to fix Pin-holes in Blackout Fabric
Zigbee Troubleshooting
485 Troubleshooting
RTS Troubleshooting
Table of Contents:
Step 1: Leveling Shims (Optional)
- Used if the window frame is out of level.
- Connect to shade brackets before installation
- Do not use more than 2 leveling shims per bracket.
Step 2: Measuring the Brackets
- Measure outside of the bracket to the outside of the bracket width and verify it matches the width the shade was ordered with.
- Adjust accordingly
Step 3: Installing the Brackets
- Install the idler side bracket inside of the pocket with a distance of 0.46 inches from the wall (backside).
- Install the idler side bracket inside of the pocket with a distance of 0.46 inches from the wall (backside).
Step 4: Installing the Roll
- To install the roll: First, insert the idler side of the roll in the idler side bracket.
- Making a slight pressure to the idler side, push up the motor side of the roll until lined up with the motor side bracket.
- Repeat this process for the other roll.
For issues, contact Screen Innovations:
Phone: 512.832.6939 Option 3
Website: www.screeninnovations.com
Comments
0 comments
Please sign in to leave a comment.