Nano Indoor Shades
Complete guide to our precision-engineered Nano shading solutions
Nano Box
Nano Open Roll
Nano Pocket
Nano Duo
Nano Coupled
Nano Manual
Janus
1K PoE Switch
SI IP Bridge
Kratos
TaHoma Switch
Side Channels
TRO.Y 2
Suite XVI
C4 Zigbee
Pocket Flap and Hanger Extrusions
SI Eco-System - 485
SI Eco-System - PoE
SI Eco-System - Zigbee
SI Eco-System - RTS
RF Remote - Standalone
Zigbee Remote Standalone
TaHoma Switch
Bond Bridge Pro - RTS Only
Bond Bridge Pro - EcoSystem Integration
3rd Party Integration
Wiring Pinouts
How to service the V2 Nano Box
How to swap a motor in a V2 Nano Box
How to swap a motor in a V1 Nano Box
How to fix roll overs and hembar jams
Nano Open Roll V2 motor Swap
How to fix Pin-holes in Blackout Fabric
Zigbee Troubleshooting
485 Troubleshooting
RTS Troubleshooting
Table of Contents:
Installing Side Channels
⚠️ : Install the Nano Box shade prior to installing Side & Sill Channels.
- Pre-drill holes 3” from each end and add more holes approximately 12” apart over length.
- Side mounting will be used on inside mount installations.
- Slide extrusion up against box shade and secure to wall with included screws in each of the drilled holes.
- Repeat same for opposite side of the window.
- Repeat same for opposite side of the window.
- Roll down the shade, checking to ensure the fabric doesn’t drag or rub the inside of the channel.
- Install the Covers.
- To secure the covers, use the supplied install tool.
- Using a mallet, tap the tool to snap the outside extrusion into the mounted extrusion.
- ⚠️ : This could take quite a bit of force.
- Once started work your way down continuing to tap the tool to seat the extrusion.
- Repeat for the other side.
Installing Sill Channel - Optional
- Install the sill channel at the bottom.
- Secure the channel covers to wall with included screws in each of the drilled holes.
Removing the Side Channels
If a need arises to remove the extrusion, use the side channel removal tool.
⚠️ : Make sure the shade is rolled up to prevent damage.
- Starting at the top or bottom, insert the tool into channel at an angle as shown.
- Make sure the tool is as far into the channel as possible and pry the channel apart by rotating the tool down.
- Repeat every few inches until the side channels are fully separated.
Parts in the Box
For issues, contact Screen Innovations:
Phone: 512.832.6939 Option 3
Website: www.screeninnovations.com
Comments
0 comments
Please sign in to leave a comment.