Nano Indoor Shades
Complete guide to our precision-engineered Nano shading solutions
Nano Box
        Nano Open Roll
        Nano Pocket
        Nano Duo
        Nano Coupled
        Nano Manual
      Janus
        1K PoE Switch
        SI IP Bridge
        Kratos
        TaHoma Switch
        Side Channels
        TRO.Y 2
        Suite XVI
        C4 Zigbee
        Pocket Flap and Hanger Extrusions
      SI Eco-System - 485
        SI Eco-System - PoE
        SI Eco-System - Zigbee
        SI Eco-System - RTS
        RF Remote - Standalone
        Zigbee Remote Standalone
        TaHoma Switch
        Bond Bridge Pro - RTS Only
        Bond Bridge Pro - EcoSystem Integration
        3rd Party Integration
      Wiring Pinouts
        How to service the V2 Nano Box
        How to swap a motor in a V2 Nano Box
        How to swap a motor in a V1 Nano Box
        How to fix roll overs and hembar jams
        Nano Open Roll V2 motor Swap
        How to fix Pin-holes in Blackout Fabric
        Zigbee Troubleshooting
        485 Troubleshooting
        RTS Troubleshooting
      
Step 1: Installing Side Channels:
- Align the right face of the Side Channel with the right face of your bracket.
 - Repeat the same for the left side.
 
Step 2: Installing Side Channels:
- Pre-drill holes in the side channels
 - Install screws in place, through pre-drilled holes.
 
Step 3: Installing Side Channels:
- Install covers for each Side Channel.
 
For issues, contact Screen Innovations:
Phone: 512.832.6939 Option 3
Website: www.screeninnovations.com
Comments
0 comments
Please sign in to leave a comment.